Military Hotel Project is located in southeast Algeria in the Sahara Desert. Total land area of the project is 70.000 m² and built – up area is 10.050 m². The project consists of three star hotel with 48 standard rooms, 1 junior suite, 1 senior suite, 1 VIP suite, restaurants, cafeterias and a pool. Bilyap Construction, the subsidiary of Kayı Construction in Algeria undertakes the EPC turnkey construction of the project.

Date Of Start: January 2015

Location: DJANET / ALGERIA

Total Construction Area: 8,300 m²

Client: Ministry of National Defence